South Central Railway
Important Info
AOC Description
South Central Railway has published Supply Of compressed oxygen gas to is:309/2005 (fourth revision).terms and conditions:1. the empty gas cylinders are to be collected from sse/c&w/gy and refilled oxygen gas cylinders are to be delivered to consignee end by the firm whenever required by the consignee. 2.collection of empty and delivery of refilled oxygen cylinders should be done within 48 hrs.from the date of intimation. 3. [a]loading/unloading of empty/refilled oxygen gas cylinders will be provided at consignee end only. [b]loading/unloading of empty/refilled oxygen gas cylinders at the refilling point should be done by the firm. , compressed oxygen gas to is:309/2005 (fourth revision). terms and conditions: 1. the empty gas cyli nders are to be collected from sse/c&w/gy and refilled oxygen gas cylinders are to be delivered to consignee end by th e firm whenever required by the consignee. 2.collection of empty and delivery of refilled oxygen cylinders should be do ne within 48 hrs.from the date of intimation. 3. [a]loading/unloading of empty/refilled oxygen gas cylinders will be pro vided at consignee end only. [b]loading/unloading of empty/refilled oxygen gas cylinders at the refilling point should be done by the firm. ]. Last date of submission for this tender is 2026-05-19. This is a Industrial Gases tender in Guntakal, Andhra Pradesh
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

