Rail Wheel Factory
Important Info
AOC Description
Rail Wheel Factory has published Supply Of spares for 3 ton godrej forklift (2 items) , piston selector assembly to godrej part no:31391599dg00137 for the use of go drej 3 ton forklift.warranty/guarantee period shall be for a period of minimum 6 months fr om the date of fitment or 9 months from the date of supply whichever is early against qual ity manufacturing defects and workmanship for the item supplied. [ warranty period: 9 month s after the date of delivery ] ] , bearing cap to godrej part no:31101799dg00063 for the use of godrej 3 ton for klift. warranty/guarantee period shall be for a period of minimum 6 months from the date of fitment or 9 months from the date of supply whichever is early against quality manufacturing defects and workmanship for the item supplied. [ warranty period: 9 months af ter the date of delivery ] ]. Last date of submission for this tender is 2026-08-04. This is a Lifting Equipment tender in Bangalore, Karnataka
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

