Fertilisers And Chemicals Travancore Limited
Important Info
AOC Description
Fertilisers And Chemicals Travancore Limited has published Replacement Of Various Drive Motors , Gearboxes , Trunnion Rollers , Thrust Rollers Etc . In Np And Off Site Area , Fact Cd . , Replacement Of Various Drive Motors , Gearboxes , Trunnion Rollers , Thrust Rollers Etc . In Np And Off Site Area , Fact Cd . , Replacement Of Gear Box Of Dryer A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Gear Box Of Dryer A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation Bolts Of The Existing Gear Box Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Gear Box Shall Be Transported To Site . The Gear Box Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . Rigging Assistance Shall Be Provided For The Alignment Of Gear Box . The Out Side Surface Area Of The Damaged Gear Box Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Motor Of Dryer A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Motor Of Dryer A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation Bolts Of The Existing Motor Shall Be Loosened / Removed And Lead / Transported To Electrical Work Shop . The New / Spare Motor Shall Be Transported To Site . The Motor Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . Rigging Assistance Shall Be Provided For The Alignment Of Motor . , Replacement Of Trunnion Roller Of Dryer A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Trunnion Roller Of Dryer A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation / Jack Bolts Of The Existing Damaged Trunnion Roller Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Trunnion Roller Shall Be Transported To Site From Store / Work Shop . The Trunnion Roller Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . After Checking The Measurement And Alignment Of The Trunnion Rollers , The Foundation / Jack Bolts Shall Be Tightened Properly . If Required , The Thrust Roller Shall Be Re-Arranged . The Out Side Surface Area Of The Damaged Trunnion Roller Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Thrust Roller Of Dryer A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Thrust Roller Of Dryer A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation / Jack Bolts Of The Existing Damaged Thrust Roller Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Thrust Roller Shall Be Transported To Site From Store / Work Shop . The Thrust Roller Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . After Checking The Measurement / Alignment Of The Thrust Rollers , The Foundation / Jack Bolts Shall Be Tightened Properly . The Out Side Surface Area Of The Damaged Thrust Roller Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Motor Of Product Cooler A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Motor Of Product Cooler A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation Bolts Of The Existing Product Cooler Motor Shall Be Loosened / Removed And Lead / Transported To Electrical Work Shop . The New / Spare Motor Shall Be Transported To Site . The Motor Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . Rigging Assistance Shall Be Provided For The Alignment Of Product Cooler Motor . , Replacement Of Gear Box Of Product Cooler A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Gear Box Of Product Cooler A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation Bolts Of The Existing Gear Box Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Gear Box Shall Be Transported To Site . The Gear Box Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . Rigging Assistance Shall Be Provided For The Alignment Of Gear Box . The Out Side Surface Area Of The Damaged Gear Box Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Motor Of Granulator A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Motor Of Granulator A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation Bolts Of The Existing Granulator Motor Shall Be Loosened / Removed And Lead / Transported To Electrical Work Shop . The New / Spare Motor Shall Be Transported To Site . The Motor Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . Rigging Assistance Shall Be Provided For The Alignment Of Product Cooler Motor . , Replacement Of Trunnion Roller Of Granulator A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Trunnion Roller Of Granulator A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation / Jack Bolts Of The Existing Damaged Trunnion Roller Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Trunnion Roller Shall Be Transported To Site From Store / Work Shop . The Trunnion Roller Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . After Checking The Measurement And Alignment Of The Trunnion Rollers , The Foundation / Jack Bolts Shall Be Tightened Properly . If Required , The Thrust Roller Shall Be Re-Arranged . The Out Side Surface Area Of The Damaged Trunnion Roller Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Trunnion Roller Of Product Cooler A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Trunnion Roller Of Product Cooler A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation / Jack Bolts Of The Existing Damaged Trunnion Roller Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Trunnion Roller Shall Be Transported To Site From Store / Work Shop . The Trunnion Roller Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . After Checking The Measurement And Alignment Of The Trunnion Rollers , The Foundation / Jack Bolts Shall Be Tightened Properly . If Required , The Thrust Roller Shall Be Re-Arranged . The Out Side Surface Area Of The Damaged Trunnion Roller Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Thrust Roller Of Granulator / Cooler A Or B In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Thrust Roller Of Granulator / Cooler A Or B In Np Plant . The Tools And Tackles Shall Be Arranged . Foundation / Jack Bolts Of The Existing Damaged Thrust Roller Shall Be Loosened / Removed And Lead / Transported To Mechanical Work Shop . The New / Spare Thrust Roller Shall Be Transported To Site From Store / Work Shop . The Thrust Roller Shall Be Kept In Position And Insert The Foundation Bolts , After Cleaning The Base Plate . After Checking The Measurement / Alignment Of The Thrust Rollers , The Foundation / Jack Bolts Shall Be Tightened Properly . The Out Side Surface Area Of The Damaged Thrust Roller Shall Be Cleaned Properly , At Mechanical Work Shop . , Replacement Of Motor Of Vibrator Screen , A Or B Stream In N P Plant . Work Involves: The Required Site Arrangements Shall Be Done For The Replacement Of Motor Of Vibrator Screen A Or B Stream In Np Plant . The Tools And Tac. Last date of submission for this tender is 2020-06-29. This is a Rubber And Plastic Processing Machinery tender in Ambalamedu, Kerala
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
No Documents Found
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |