Central Railway
Important Info
AOC Description
Central Railway has published Supply Of set of u clamp for 20 mm and 25 mm bore fp/bp pipeline consisting of 2 items- i. u clamp for 20 mm bore fp/bppipe line to icf drg. no. wgscn/c-3-5-005 alt-m/nil. itemno.1 0 (u clamp) = 2 nos. item no. 12 (spring lock washerb10) = 4 nos. and item no. 13 (hex nut m10) = 4 nos. ii. u clampfor 25 mm bore fp/bp pipe line to icf drg. no. wgscn/c-3-5-005 alt- m/nil. item no.11 (u clamp) = 2 nos. item no. 12(spring lock washer b10) = 4 nos. and item n o. 13 (hex nutm10) = 4 nos. material and specification as per drawing. packing instructions:1 . set to be supplied in assembled condition, 2. 20 mm & 25 mm bore u clamps set should be supplied in separat packings. [ warranty period: 30 months after the date of delivery ] ]. Last date of submission for this tender is 2026-05-09. This is a Railway Ancillaries tender in Parel, Maharashtra
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

