Rail Coach Factory
Important Info
AOC Description
Rail Coach Factory has published Supply Of Supply And Apply Of Set Of Roller Blind Arrgt. For Lhb First Ac Coachessupply And Apply Of Set Of Roller Blind Arrgt. For Lhb First Ac Coaches,Supply And Apply Of Set Of Roller Blind Arrgt. For Lhb First Ac Coaches. Colour Shade Is Combination Of Ral-Ds-040 20 19 And Ral-Ds-8000 Is To Be Followed.(Ref. Md22151 Dtd 28.09.22), As Per Drawing: La64020 Alt B Without Item No. 9. And Follow Corrigendum To Spec.No.Mdts-078 Rev-3 Issuded Vide Design Lno.Md35131 Dt.13.01.2023, [ Warranty Period: 30 Months After The Date Of Delivery ] => Limited. Last date of submission for this tender is 2023-12-04. This is a Curtains tender in Kapurthala, Punjab
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

