Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of supply of ceiling arrangement of lwfcwac coach , supply of ceiling arrangement of lwfcwac coach for linen and corridor a rea at npp end to drawing no wa44161, alt-a, ceiling arrangement for attendant, linen room and corridor area at pp end to drawing no wa44158, alt-b and ceiling arrangeme nt of gang way and doorways to drawing no wa44157, alt-nil, anx-1. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-09-08. This is a Linen tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

