Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Short dated tender - Supply Of s&i e.p brake eqpt memu/tc/jk,memu/ndmc/jk & memu/dmc/jk , supply,installation and commissioning of e.p brake equipment for memu/dmc/ jk coach to material schedule no.icf/sk-10-2-703, issue status-01,rev-00 and confirming t o rdso specification no.rdso/2013/cg-03 (latest revision /amendment). installation: insta llation to be done as per scope of installation & testing icf/mfpl/170/001, issue status -0 1, rev-02, amd-01 and schedule of drawings and permissible timings to icf/mfpl/170/944, is sue status -01, rev-00. note:- 1) packing condition shall be as per doc.no.pc-052 of icf/md/ spec-485. 2) quantity required per rake: 2 sets [ warranty period: 36 months after the date of delivery ] ] , supply, installation and commissioning of e.p brake equipment for memu/ndm c/jk coach to material schedule no.icf/sk-10-2-704, issue status-01, rev-00 and confirming to rdso specification no. rdso/2013/cg-03 (latest revision /amendment). installation: inst allation to be done as per scope of installation & testing icf/mfpl/170/001, issue status - 01, rev-02, amd-01 and schedule of drawings and permissible timings to icf/mfpl/170/962, i ssue status -01, rev-00. note:- 1) packing condition shall be as per doc.no.pc-052 of icf/md /spec-485. 2) quantity required per rake: 1 set [ warranty period: 36 months after the date of delivery ] ] , supply,installation and commissioning of e.p brake equipment for memu/tc/j& k coaches to rdso specification rdso/2013/cg-03 (latest revision /amendment) and to mat erial schedule no. icf/sk-10-2-698, issue status- 01, rev- 00,cs-01. installation: installatio n to be done as per scope of installation & testing icf/mfpl/170/001, issue status -01, rev- 02, amd-01 and schedule of drawings and permissible timings to icf/mfpl/170/941, issue st atus -01, rev-00. note:- 1) packing condition shall be as per doc.no.pc-052 of icf/md/spec-4 85. 2) quantity required per rake: 9 sets [ warranty period: 36 months after the date of deliver y ] ]. Last date of submission for this tender is 2026-09-25. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |