Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Short dated tender - Supply Of supply and installation of frp dismantable modular toilet with pan , supply and installation of frp dismantable modular toilet with pan for dm u/memu coaches to drg. no.memu/tc6(747)-6-3-001,alt -c, col-i,with frp window cover as p er note no.2 & except item-6,28 and 29 and as per specification icf/md/spec-384, rev-00, am d-01 to amd-03(latest). please visit icf vendor portal for downloading drawing https://vp.icf.gov.in /vendtendordetnew.php using key:0726vf6akgh3117 [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permit ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-09-29. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

