Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of one rake set of axle box front cover for vb/ts , one rake set of axle box front cover for vb/ts consisting of 1) axle box front cover with one sensor (lh) to medha drg no c-a675uv2-135627,rev-04 - qty-28 nos, 2) axle box front cover wit h one sensor (rh) to medha drg no c-a675uv2-135334,rev-03 - qty-28 nos, 3) axle box front cover with two sensors (lh) to medha drg no c-a675uv2-135962,rev-03 - qty-4 nos, 4) axle box front cove r with two sensors (rh) to medha drg no c-a675uv2-135335,rev-01 - qty-4 nos, 5) axle box front co ver for tacho generator to medha drg no c-a675uv2-135336,rev-04 - qty-4 nos note: for item sl.no .4, modification drg no 32902063, alt nil---- also to be followed for drilling of locator pin holes to dia 3.5+/-0.1 - 4 holes, 6mm deep. special condition : there will be minor modification in design f irm may be advised to collect final drawing before manufacturing suitable packing to be done to avoid damage during transit, unloading and rust revention during storage . [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-08-19. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

