Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Short dated tender - Corrigendum : Supply Of shell kit (memu tc cgpcil) , shell kit for memu/tc6/cgpcil( data code 747) a. roof assembly - 74716005 000 01, alt a - 1 n o, location of sidewall - 74714001 000 01, alt nil - 1 no, end construction -alarm end- 74715024 000 01, alt nil - 1 no, end construction-non-alarm end-74715025 000 01, alt nil - 1 no. firm shall fulfil the man ufacturing facility as per icf/md/specn. 200, issue status 01, rev 04 with amendment no 01 firm shall fulfil the manufacturing facility as per icf/md/spec-315, issue status-01, rev.00 with amendment no 01. b. body shell items. 1. 74710007, alt c col-i - 2 nos 2. 74710021, alt nil col-i - 1 no 3. 74710018, alt nil col-i - 2 nos 4. 74710019, alt nil col-i - 2 nos 5. 74710020, alt a col-i - 2 nos 6. aaa10278, alt nil - 4 nos. c. underfra me complete for memu/tc6 coach to drg no. (747) memu/tc6-1-1-001, col-2, alt g- 1 no. firm shall fulfil the manufacturing facility as per icf/md/spec-147, issue status-01 rev.02 with amendment no.02. special c ondition : packing as per icf/j&t/misc-2201,alt f. packing as per icf/j&t/sk-1809,alt a. packing conditio n as per drg.no.icf/j&t/misc-2487, alt b. the underframe should be supplied as normal side up & side bearer side down. packing condition as per icf/j&t/sk-1865, alt a. stage inspection. (a) raw material sta ge # ensure the raw material used using portable spectrometer (b) jig stage # assembly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be checked & recorded (c) trestle stage # marki ng, drilling & tapping of holes wherever necessary. # marking & placing of detail items. # complete welding where ver necessary. # weld parameters to be checked & recorded # assembly & welding of trough sheets. # dimension al & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stag e. # short/sand blast to the requirements. # painting process as per the specification. # visual inspection. # final p roduct inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surfa ce of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corro ssion. [safety item] [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lac s ] ]. Last date of submission for this tender is 2026-08-18. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

