Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of nylon bush dia , nylon bush to drg.no. emu/m 3-2-060/1 alt.`f. special condition : suitable packi ng to be done to avoid damage during transit, unloading and rust prevention during s torage. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] , nylon bush to drg. no. emu/m-3-2-060/2, alt. `f special condition : suitable pack ing to be done to avoid damage during transit, unloading and rust prevention during storage. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] , nylon bush to drg. no. emu/m-3-2-060, item 4, alt f. . special condition : suitabl e packing to be done to avoid damage during transit, unloading and rust prevention d uring storage [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] , nylon bush to drg.no.emu/m-3-2-060 item 5, alt f. special condition : suitable p acking to be done to avoid damage during transit, unloading and rust prevention duri ng storage. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] , nylon bush to drg.no.emu/m 3-2-060/6 alt.`f. special condition : suitable packin g to be done to avoid damage during transit, unloading and rust prevention during st orage. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] , nylon bush to drg.no.emu/m 3-2-060/7 alt.`f. special condition : suitable packin g to be done to avoid damage during transit, unloading and rust prevention during st orage. [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ] , nylon bush to drg.no. emu/m 3-2-060/8 alt.`f. special condition : suitable packi ng to be done to avoid damage during transit, unloading and rust prevention during s torage [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-06-16. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

