Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of s&i of trcc cable cl ing arrgt for km , supply and installation of epdm assembly for kolkata metro trcc cables to icf drawing no: icf/sk3 -7-1-113 alt-e or latest, the requirement for one 8 car rake set. 1. col- iii (3 module assly.) - 32 nos. 2. col-iv (3 module assly.) - 40 nos. 3. col - v (single module assly.) - 104 nos. note: 1) one p rototype sample of each assembly along with its drawing shall be submitted for approval before effect ing bulk supply. (items shall be supplied only as per the approved drawing) [ warranty period: 30 m onths after the date of delivery ] ]. Last date of submission for this tender is 2026-07-31. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

