Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of s&i of c/s of seats lslrd pp , supply and installtion of one coach set of seats and berths with hardwar e for lslrd pp coach to drawing 756-6-1-002 (except items 12,23,25 to 30 and 71 and relat ed fixing hardware in col-i) col-1, alt-b.cushioning material shall be pu foam as per rds o specification no.rdso/2007/cg04, rev-01 or latest and upholstery to rdso spec.rdso/2 008/cg-07 rev-01 or latest. note: firm has the option for offering seats and berths cus hion with lower density of 65%b15 kg/m3 conforming to spec.rdso/2007/cg-04,rev-01 or latest also.colour of upholstery, aluminium tub, aluminium moulding and frames shall be as per letter no.md/ss/lhb/103b/ab dated-14.05.2026 upholstery sample to be submitte d to icf design for approval along with test certificates. please visit icf vendor portal for downloading drawing https://vp.icf.gov.in/vendtendordetnew.php using key:0726dz3nwd02648 [ w arranty period: 120 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-08-24. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

