Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of shell kit (memu dmc jk) , shell kit for memu dmc1 jk 944 a. roof assembly - 94416001 000 01 alt nil - 1 no. lo cation of sidewall -94414001 000 01 alt nil - 1 no. end construction pail end -94515001 000 01 alt a - 1 no. firm shall fulfill the manufacturing facility as per icf/md/specn-200, issue statu s 01, rev 04 with amendment no 01. firm shall fulfill the manufacturing facility as per i cf/md/specn-315, issue status-01, rev.00 with amendment no 01. b.supply of one coach se t of body shell items and partition frames for memu dmc jk 944 to drawing nos: 1. 94410 003 000 01 alt a - 1 no. 2. 74510257 000 01 alt nil - 1 no. 3. 94410004 000 01 alt nil - 1 no. 4. 7451 0045 000 01 alt nil - 1 no. 5. 94410005 000 01 alt nil - 1 no. 6. 94410002 000 01 alt b - 1 no. 7. 944 10076 000 01 alt nil - 1 no. 8. 94410072 000 01 alt nil - 1 no. 9. 94410054 000 01 alt nil - 2 nos. c. u nderframe arrangement 94411001 000 01 alt b - 1 no. firm shall fulfill the manufacturing fa cility as per icf/md/specn-147, issue status-01 rev.02 with amendment no.02. special conditi on : packing as per icf/j&t/misc-2201, alt f. packing as per icf/j&t/sk-1809, alt a. packing c ondition as per drg.no.icf/j&t/misc-2487, alt b the underframe should be supplied as n ormal side up & side bearer side down. packing conditionas per icf/j&t/sk-1865, alt a. (a) raw material stage # ensure the raw material used using portable spectrometer (b) jig stage # assem bly of front part with sole bar. # assembly of modular frame arrangement. # weld parameters to be c hecked & recorded (c) trestle stage # marking, drilling & tapping of holes wherever necessary. # mar king & placing of detail items. # complete welding wherever necessary. # weld parameters to be che cked & recorded # assembly & welding of trough sheets. # dimensional & visual checks. # punching of serial no & ensuring proper traceability. (d) surface preparation and painting stage. # short/sand b ast to the requirements. # painting process as per the specification. # visual inspection. # final produ ct inspection. note: application of aluminium welding coat to rcf spec mdts-28272 latest revision on top surface of cross members shall be ensured before welding the trough floor with cross members to avoid bi-metallic corrossion. [safety item] [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-05-11. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

