Integral Coach Factory
Important Info
AOC Description
Integral Coach Factory has published Supply Of nominal bore pipes , one set of nominal bore pipes and pipe nut viz.for lhb coaches to drg no 1. brake pipe 25nb to drg. no. mi005808 ,alt c- 1 no, 2. brake pipe 25nb todrg. no. mi005809 , alt b- 1 no, 3. brake pipe 25nb to drg. no. mi006331 ,alta- 1 no, 4. brake pipe 25nb to dr g.no. mi006330,alt nil - 1 no and 5.hex. pipe nut g 1 to ss gr aisi 304 is:3468-1991 - 4 nos. note: 1.pipes shall conform to drawings of latest alteration. 2.for pipes and joints for air brakes to spec.no.04-abr-02,with amd-01 to 08. 3.packing condition shall be as per d oc.no.pc-037 of icf/md/spec-485. [ warranty period: 30 months after the date of delivery ] ]. Last date of submission for this tender is 2026-08-17. This is a Railway Ancillaries tender in Chennai, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

