Southern Railway
Important Info
AOC Description
Southern Railway has published Supply Of fabrication, supply, testing and commissioning of transformer lifting/ lowering trolley for wag9/wap7 locos. , fabrication, supply, testing and commissioning of transformer lifting/ lowering trolley for wag9/wap7 locos as per els/gzb drg no. 40/wap5/abb/98, 41/wap5/abb/98 and ngp/trs/4/13.243, alt-1. and as per els/erode technical specific ation enclosed. firm has to submit clause wise comments as per technical specification , otherwise offer will not be considered . [ warranty period: 30 months after the date of delivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitted: max 8 lacs ] ]. Last date of submission for this tender is 2026-08-10. This is a Transformer Supply tender in Erode, Tamil Nadu
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

