Modern Coach Factory
Important Info
AOC Description
Modern Coach Factory has published Supply Of Copper Coated Co2 Welding Filler To Plno 76115136Copper Coated Co2 Welding Filler To Plno 76115136,Copper Coated Co2 Welding Filler Solid Wire Size 1.2Mm,Shelf Life Of Material Not To Be Less Than One Year From The Date Of Manufacturing. As Per Drg.No. Irsm-46/13 Class-1, Spool Size & Condition Of Wire As Per Is:6419-96 With Additional Requirement Of Precision Layre Winding (Plw)& Copper Contentof Coating To Be Between 0.2 To 0.5%,Weld Test As Per Aws (Sfa-5.18)Section-Ii Part-C,Cast-305 Mm Min.&Helix 25 Mm Max.In Spool Of Dia-300 Mm& Wt-12.5 Kgs., Quality Plan - N.A. As Per Drg.No. Irsm-46/13 Class-1, Spool Size & Condition Of Wire Specn: As Per Rdso Spec. No. Irsm-46/13 Class-1, Spool Size & Condition Of Wire As Per Is: 6419-96 Or Latest, With Additional Requirement Of Precision Layer Winding (Plw) & Copper Content Of Coating To Be Between 0.2% To 0.4% By Weight, Weld Test As Per Lws (Sfa-5.18) Section-Ii Part-C, Cast-305 Mm Min. & [ Warranty Period: 30 Months After The Date Of Delivery ]. Last date of submission for this tender is 2023-12-06. This is a Copper Supply tender in Rae Bareli, Uttar Pradesh
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

